System / Integration

An integrated sorting system.

A practical view of the complete process — from irregular feed material to controlled placement into defined output streams.

Feed / Perception / Robot cell / OutputConcept configuration
Illustrative sorting system in a recycling facilityConcept image
Actual installed equipment and footprint to be confirmedFeed, robot cell and output bins
Process

Four steps, one continuous flow.

Each step is engineered around the material task, with the handling result feeding the next decision.

01

Feed & present

Bring your mixed scrap stream into the working envelope.

02

See & locate

Estimate object positions and possible robotic grasp targets.

03

Pick & place

Execute a controlled pick and place into the selected output.

04

Validate & tune

Review result quality, exceptions and material-specific settings.

Composition

System composition.

Four subsystems define the cell. Their exact specification is confirmed for each installation.

01 / Feed

Material presentation

Conveyor, bin or manual feed that presents material within the working envelope.

02 / Perception

Camera & lighting

Sensing mounted to observe the pick area, with calibration for the selected material.

03 / Robot cell

Robot & end effector

Robot, gripper and safety envelope selected for the piece range and handling task.

04 / Output

Output & review

Defined output containers and a quality-review point for the sorted streams.

Specifications

Confirmed specifications at launch.

Figures are published with their measurement basis. No unverified performance figure is presented as a field result.

Acceptance target
240
Successful grasps / hour

Applicable materials and operating conditions are defined in the acceptance test. This is a specification target, not a measured field result.

ParameterWhat it definesPublication status
Rated payloadPiece mass the robot and end effector can handle reliably.Measurement basis to be confirmed.
Gripper openingMaximum part size the jaws can span in the specified tooling.To be confirmed with tooling.
Working radiusReachable area around the base, covering feed, pick and output positions with margin.To be confirmed with layout.
ThroughputSuccessful grasps per hour under defined material and operating conditions.240/hour acceptance target; measured results pending.

Performance figures are published only after testing. Cycle rate, accuracy, purity, uptime, power demand and actual footprint require agreed conditions and verified measurements.

Scope

Safety, certification, network and service.

Site requirements and documents are confirmed per installation, before quotation and commissioning.

01 / Safety

Site risk assessment

Risk assessment, guarding and emergency-stop scope are defined for each installation.

02 / Certification

Documents & declarations

Applicable declarations and electrical documentation are supplied with the final configuration. No certification is claimed before it is confirmed.

03 / Network

Connectivity & data

Connectivity, data access and remote-support requirements are agreed before commissioning.

04 / Service

Delivery scope

Preventive maintenance, spare parts and response scope are stated in the service agreement.

Deployment

Deployment conversations that matter.

A system is only a fit when the material, the site and the operating routine work together.

01 / Your material

Feed characteristics

Size distribution, typical alloy families, overlap, surface finish and desired grade split.

02 / Your site

Physical integration

Conveyor, bins, safety envelope, utilities and available operating space.

03 / Your operation

Operating routine

Cleaning, supervision, data permissions and regional support needs.

Performance figures are published only after testing.

Cycle rate, accuracy, purity, uptime, power demand and actual footprint require agreed conditions and verified measurements.

Discuss your site ↗